|
Long's Excavation & Construction uses poly fusion pipe
for a 2" waterline. Transitions are fused onto the
pipe then the curb stops are threaded on. Landscaping and
trees are saved from disruption using the horizontal boring
machine.
Completed: November 2000
Location: Torrington, WY
|