Long's Excavation & Construction excavated the soil,
then the pier columns were put into place. The soil was
placed back, then the buildings set in place. Piers were
used so that conduits could be placed underground inside
the building.
Completed: March 1996
Location: Amoco Pipeline, Ft. Laramie, WY
|