Long's Excavation & Construction dug trenches for the
electrical duct bank from the switch gear to the main building.
The pictures show backfilling to original grade.
Completed: August 2000 Location: El Paso, Natural Bridge, WY
Click on any photo for a larger view.
Copyright 2004/All rights reserved. Long's Excavation & Construction